Saturday, March 7, 2009
Pieces of Bathroom 2
Bathroom progress continues. So far the our neighbor jack hammered up the floor. Holes were dug to the drain line (you may remember the drain line from this post). The drain lines were all connected. Once the glue dried the dirt was put back in the holes. Today we helped our neighbour put down the concrete floor (2nd pic).
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment