Since we last posted we've started rebuilding the bathroom. We got the electrical and HVAC fixing done. We had a vent blowing into the attic of the kitchen (basically out the back of the house) that we rerouted to heat the bathroom (much more useful). Now the bathroom doesn't share a vent with the guest bedroom and there isn't a path for north winds to blow into the bedroom.
On Sunday we tackled the electrical and today we started the drains. So far we've got the toilet/tub drains and the vent for the vanity. Hopefully we will be able to have a floor again by the weekend. Teetering around on floor joists is losing its novelty and we're getting a bit nervous about messing up the drywall ceiling below with all the cutting/banging :S.
Monday, April 13, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment