Sunday, May 31, 2009
Friday, May 29, 2009
Wednesday, May 27, 2009
Porch update
Tuesday, May 26, 2009
Master Bedroom now with drywall
Drywall is hung and the first round of taping with durabond is done. Here's hoping we'll be priming by the weekend.
Friday, May 22, 2009
Master Bedroom update
This room hasn't been mentioned for a while in this blog.. mainly because progress on it ground to a halt while we built/renovated 2 bathrooms. The master bedroom served as a handy place to store building material and work on construction while we redid the upstairs bathroom, but now that the bathroom is done it is time that this room finally gets finished. Having to spend 2 nights in this room (with the old clawfoot tub in the corner of it!) while a friend visited really drove this point home.
While renovating/building the bathrooms we were reminded how much easier drywall is than skim coating. While we hate to waste the time we spent trying to skim coat this room... the promise of perfect walls for the price of a couple days of drywalling work is pretty tempting. (A word of advice to any other would be home renovators... learn to plaster/drywall. This will save you scads of $$ and with practice it isn't that hard.)
Here is the bedroom while it was a workshop:
Since we decided to do drywall in this room we figured it would be a good idea to bash down the non-insulated external wall and add some insulation to it. Here is the progress today:
Tomorrow we will be heading to "the depot" bright and early to buy scads of quarter/half inch drywall. *yay* At least the DIY delivery option is pretty cheap ($20 van rental :D )
While renovating/building the bathrooms we were reminded how much easier drywall is than skim coating. While we hate to waste the time we spent trying to skim coat this room... the promise of perfect walls for the price of a couple days of drywalling work is pretty tempting. (A word of advice to any other would be home renovators... learn to plaster/drywall. This will save you scads of $$ and with practice it isn't that hard.)
Here is the bedroom while it was a workshop:
Since we decided to do drywall in this room we figured it would be a good idea to bash down the non-insulated external wall and add some insulation to it. Here is the progress today:
Tomorrow we will be heading to "the depot" bright and early to buy scads of quarter/half inch drywall. *yay* At least the DIY delivery option is pretty cheap ($20 van rental :D )
Saturday, May 16, 2009
Porch progress
Monday, May 11, 2009
Upstairs bathroom finally done
We stopped counting days when the bathroom started to function (and because the amount of time trim/finishing stuff takes is way to depressing to think about) but now it is finally pretty much done (aside from a flange we ordered online and other tiny things but yee... lets call it done). Here are some pics.
Sunday, May 10, 2009
When you have overnight guests coming...
Do not rip out carpet. Clean your house. Relax and prepare to be a good host.
After redoing the bathroom the carpet on our stairs/landing was pretty much toast (even more toast than when we moved in)
So we ripped it off today. The landing revealed some nice hardwood. The stairs... well it made our entryway resemble the gates to hell...
So we went to home depot and picked up 5 cheap 6'x28" runners and some heavy duty staples for about $150. After 1.5 hours of work we now have the following (trinity approved) stairs:
This was a crazy thing to do and now we still have to clean the house after all the renos... but damn it looks good (at least until we get around to fixing up the stairs properly).
After redoing the bathroom the carpet on our stairs/landing was pretty much toast (even more toast than when we moved in)
So we ripped it off today. The landing revealed some nice hardwood. The stairs... well it made our entryway resemble the gates to hell...
So we went to home depot and picked up 5 cheap 6'x28" runners and some heavy duty staples for about $150. After 1.5 hours of work we now have the following (trinity approved) stairs:
This was a crazy thing to do and now we still have to clean the house after all the renos... but damn it looks good (at least until we get around to fixing up the stairs properly).
Wednesday, May 6, 2009
Sunday, May 3, 2009
Upstairs bathroom: day 23
Subscribe to:
Posts (Atom)